...
...
Instrument A
...
The COSMIN Risk of Bias checklist is modular, containing 10 boxes with standards for PROM development and nine measurement properties (see Table below). The PROM development box only needs to be completed for studies that report on the development of a measurement instrument. Likewise, each measurement property box only needs to be completed if a particular study has assessed that property. It may be useful for reviewers to create a table following the template below to identify which boxes need completing for each study.
...
Instrument
...
Included Studies
...
Outcomes
...
PROM Development
...
Content Validity
...
Structural validity
...
Internal consistency
...
Cross-cultural validity/measurement invariance
...
Reliability
...
Measurement error
...
Criterion validity
...
Hypotheses testing for construct validity
...
Responsiveness
Instrumento | Estudios incluidos | Resultados | |||||||||
Desarrollo PROM | Validez del contenido | Validez estructural | Consistencia interna | Validez transcultural / invariabilidad de la medición | Fiabilidad | Error de medición | Validez de criterio | Pruebas de hipótesis para la validez de constructo | Capacidad de respuesta | ||
Instrumento A | Estudio 1 | x | x |
| x | x | x |
...
|
|
|
| ||
Estudio 2 |
| x |
| x | x |
...
|
|
|
|
| ||
Estudio 3 |
| x |
| x |
| x |
...
|
|
|
|
Instrumento B |
...
Estudio 4 | x | x | x | x |
...
|
|
|
|
|
| ||||
Estudio 5 |
| x | x | x |
|
|
|
| x |
...
| ||||||
Estudio 6 |
| x | x | x | x | x |
...
|
|
|
|
Instrumento C |
...
Estudio 7 |
| x |
| x |
|
|
|
|
| x |
...
Estudio 8 |
| x |
| x |
|
| x |
...
|
|
|